MGB Parts garage sale Sunday 7 April
All parts are from chrome bumper cars, mostly in "as removed" condition ( not cleaned / rebuilt / painted etc )
Mostly mechanical parts ( ie not interior trim, but a few of those items )
4 x 5 bearing engines
1 x non overdrive 4 synchromesh gearbox
Driveshafts
Complete front suspension units - wire wheel and steel wheel
Front suspension parts
Front and rear shocks
Front Crossmembers
Gearbox crossmembers
Banjo diff casings
Banjo diff heads
Banjo axles - wire wheel and steel wheel
MK1 GT rear seats
Chrome Rostyle wheels
Early roadster disc wheels
Complete Salisbury diff
Brake calipers
Miscellaneous engine parts
Lynn Rogers race camshaft
Chrome bumper steering racks
Steering columns
Smiths gauges
Generators
Starter motors
Alternator
Pedal boxes
Radiator panels
Roadster windscreen frame
MK1 and 2 dashboards
Brand new wiring loom for MK1 car, but with alternator and pre-engaged starter
+ lots of other smaller stuff I can't remember off the top of my head
Multiples of lots of items as I have stripped 6 cars over the years
All parts cash and carry ( heavy items excepted ).
What doesn't sell is going to the metal recyclers so bring cash because I'd rather sell it cheap to someone who wants it than dump it for scrap value
This Sunday 7th April, 10am to 2pm. Msg me here for address
Neighbourhood Challenge: Who Can Crack This One? ⛓️💥❔
What has a head but no brain?
Do you think you know the answer? Simply 'Like' this post if you know the answer and the big reveal will be posted in the comments at 2pm on the day!
Want to stop seeing these in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.
Auckland Harbour Bridge summer works
NZ Transport Agency Waka Kotahi is carrying out essential maintenance on the Auckland Harbour Bridge this December and January. The southbound clip-on lanes will be closed (24/7) from 26 December to 5 January for road resurfacing. Night-time lane restrictions will be in place throughout the summer for recoating work on the bridge. Traffic will still be able to travel in both directions at all times.
Loading…