89 days ago

Appreciation post

The Team from Southern District Police

Thank you to all our essential service workers working tirelessly to ensure our communities are kept safe.

Issac is 81years old and was observed by a member of the public struggling to walk to the supermarket. A quick interaction with Isaac revealed he was in need of some intervention.

Community Constable Reuben Boniface ?‍♂️ was able to connect Issac with Age Concern Southland and with their assistance provide a care package of cooked meals and loaves of bread to help him through this time ? #kindnessgoesalongway

Image
More messages from your neighbours
M
5 days ago

Hellenic New Zealand Congress AGM/Greek documentary - free entry

Mee Moi from Mount Cook

Wellington premiere of "Ο Ηρακλής, ο Αχελώος, και η Μεσοχώρα" (Heracles, Acheloos and Mesochora, with English subtitles). The movie will start at 3.30pm after the AGM tea/coffee break as the AGM is being held same day at 2.15pm (all welcome) in the TTC clubrooms.

"The village of Mesochora, as well as the paternal home of the documentary director, is on the banks of the Acheloos river, in the mountain range of Pindos. The area, however, is flooded by the artificial lake created by the diversion of the river.

The documentary unfolds the incredible story of the hostage of the village, the family tragedy of the director himself, and the admirable struggle of the inhabitants of Mesochora."

We would like to thank the director and ERT for providing this film to us free of charge and to Elias Pavlidis for organizing the film to come to Wellington.

More info on Facebook page for Hellenic New Zealand Congress or on Eventfinda.

Direction: Δημήτρης Κουτσιαμπασάκος

Script: Δημήτρης Κουτσιαμπασάκος Cinematography: Yorgos Papaioannou

Editing: Yorgos Savoglou Sound: Nikos Paliatsoudis, Antonis Kypreos, Yorgos Petroutsas

Music: Vangelis Fampas Production: ERT Production

Country: Greece | Production Year: 2019

1 hour ago

Mt Albert Tunnel Entry

The Team from Wellington Water

The final stage of the repair to the Mt Albert tunnel and sludge lines involves repairing the floor of the tunnel. As part of this, on Thursday night a crew will be entering the tunnel to perform a visual inspection.

As the tunnel is an active wastewater pipe, we’ll hold wastewater flows at the pump station while the inspection is carried out. We’re scheduling the entry at night when wastewater flows are at a minimum, thereby maximising the amount of time our crews can spend in the tunnel. The plan is for the crew to spend 40 minutes in the tunnel, while based on normal operations we have capacity at the pump station to hold the wastewater flows for up to an hour. In the very unlikely event that the crew has to spend more than an hour in the tunnel, some screened wastewater may need to be discharged from the pump station into the Cook Strait. All possible steps will be taken to prevent this, however it is important to note that this inbound wastewater is made up of 99% water, and is therefore very different to the dewatered sludge that was transported during the earlier stage of repairs. Generators onsite may create some noise, however there will be no construction undertaken during this entry. We will monitor odour and use misters if necessary.

2 hours ago

Share a local story with your neighbours.

The Team from Neighbourly.co.nz

Hi neighbours!
Do you know of a story around your neighbourhood that hasn't hit the front-page yet? Is there someone in your suburb who really embodies the Neighbourly spirit and deserves for their story to be told? Maybe it’s a local hero who's remained humble. Even if it's anything that you think the nation needs to know, comment on our post below!

Image