Tell me the truth!
Have you ever asked your dentist who is carrying out your braces or Invisalign treatment, if they are actually a specialist orthodontist or if they are a dentist with an interest in orthodontics?
Why choose a specialist orthodontist?
Only specialist orthodontists have a minimum of 5000 hours of training, three years of postgraduate doctoral training.
So that’s on top of 5 years of dental school and practising as a dentist for a minimum of 2 years.
If you what to be sure have a look at the NZAO (Association of Orthodontists NZ) web site.
That is why we can guarantee the result of our work.
Your beautiful customised Bachmannsmile.
Have you seen a non -specialist and would like a second opinion from a registered orthodontic specialist.
Feel free to make an appointment today 09 448 1128
What can we do to make you smile?
.
.
.
.
.
.
.
.
.
.
#orthodontist #dentist #orthodontics #dentistry #specialist #specialistorthodontist #training #registert #bike #bicycle #applesandpears #applesandoranges #smile #smiledental #bigsmile #bachmannsmile #bachmannorthodontics #braces #invisalign #orthodontic #albanyorthodontic #northshoreorthodontist #costofbraces #bestsmiles #nzschool #bestschools #northshoreschools
Some Choice News!
Many New Zealand gardens aren’t seeing as many monarch butterflies fluttering around their swan plants and flower beds these days — the hungry Asian paper wasp has been taking its toll.
Thanks to people like Alan Baldick, who’s made it his mission to protect the monarch, his neighbours still get to enjoy these beautiful butterflies in their own backyards.
Thinking about planting something to invite more butterflies, bees, and birds into your garden?
Thanks for your mahi, Alan! We hope this brings a smile!
Auckland Harbour Bridge summer works
NZ Transport Agency Waka Kotahi is carrying out essential maintenance on the Auckland Harbour Bridge this December and January. The southbound clip-on lanes will be closed (24/7) from 26 December to 5 January for road resurfacing. Night-time lane restrictions will be in place throughout the summer for recoating work on the bridge. Traffic will still be able to travel in both directions at all times.
Loading…