$5.4m pipe upgrade at Takapuna Beach to prevent sewage spills
Kia ora neighbours. A $5.4 million pipe upgrade could help prevent sewage from overflowing onto Takapuna Beach.
The upgrade of the 1.6km wastewater pipe, which runs the full length of the beach, began this week and would take until around August to complete, Watercare project manager Johan Gerritsen said.
Recent investigations found the pipe, built in the 1940s, was in urgent need of an upgrade.
“By relining this section of the pipe we’ll extend its life by 50 years and significantly reduce wastewater overflows in the area.”
The work would be done by a self-propelling device, which spins around inside the pipe to line it with plastic.
That would eliminate the need for workers to dig trenches to get to the pipe, meaning disruption to beachgoers would be minimal, road closures unnecessary and the pipe might still be used during the project.
“It’s also faster, cheaper and has a lower carbon footprint,” Gerritsen said.
Click 'read more' for the full story.
Poll: 🗑️ Would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?
Aucklanders, our weekly rubbish collections are staying after councillors voted to scrap a proposed trial of fortnightly pick-ups.
We want to hear from you: would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?
Keen for the details? Read up about the scrapped collection trial here.
-
85% Same!
-
15% Would have liked to try something different
Art day for children (ages 7-12yrs)
If your child loves drawing and painting they’ll love this one-day workshop with artist Eion Bryant. With step-by-step instruction children will draw then create a vibrant acrylic painting learning tips and techniques along the way. Fun and focused!
Venue: Beach Haven Community House, January 21, 11.00am - 4.00pm Cost: $70
Bookings: eion@eionbryant.com
Ph 0211327033 or 0210606641
Loading…