New Beach Haven Road Crossing
Auckland Transport will soon begin work on the construction of a new raised pedestrian crossing outside 190 Beach Haven Rd and a stormwater drainage catchpit.
Work will begin on Monday 11 September and continue for approx 6 weeks (weather dependent). Hours of work are 7am to 5pm and stop/go traffic management will be in place. There will also be a temporary walkway for pedestrians.
The project was consulted on earlier this year and is proceeding as designed. It includes installing yellow lines at the Paragon Rd intersection to make it safer for exiting vehicles.
For more detail on the project and responses to feedback, see:
at.govt.nz...
Poll: 🗑️ Would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?
Aucklanders, our weekly rubbish collections are staying after councillors voted to scrap a proposed trial of fortnightly pick-ups.
We want to hear from you: would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?
Keen for the details? Read up about the scrapped collection trial here.
-
85.3% Same!
-
14.7% Would have liked to try something different
Loading…