A
86 days ago

Signalized Pedestrian Crossings, 4 of 5 working after 4 months

Alan from Birkdale

Ratepayers paid $2,450,000 conservatively for 3 signalized crossings at Glenfield Rd / Coronation Rd and 2 in Raleigh Rd about 4 months ago and never switched on.
Pedestrians were using the roundabout crossings during this time.
In January this year the Northcote MP had a meeting with AT's CEO about local traffic issues in which he found out that no power had been connected to these signals.
Having this information Mayor Brown was emailed asking why the signals were not working after 4 months and the legality of the crossings.
AT acknowledged the Mayoral email ( usual channel as the Mayor has to receive an answer) on 26 January 2024
AT updated 14 February still working on the answer.
Vector installed the power supply to the Raleigh Rd crossing about 2 weeks ago ( the one with the misaligned overhead arm ) which is still not operational.
Question is, why so long before being switched on as it seems system is dysfunctional in the project area?
Were the pedestrian crossings legal as the lights were never commissioned?
If nothing else contacting your MP and Mayor has results of which we are still waiting!

More messages from your neighbours
18 hours ago

What is your favourite bedtime snack?

Jay from Beds4U Glenfield

What's your ultimate bedtime indulgence? Complete the sentence: 'The best bedtime snack is______.' Comment below and let's share our favourite treats for a dreamy night's sleep!

Image
5 days ago

Poll: Have you ever been bullied?

The Team from Neighbourly.co.nz

People associate bullying with children in schools, but it can actually stretch beyond childhood to workplaces or neighbourhoods.

This Friday is Pink Shirt Day, which began in Canada in 2007 when two students took a stand against homophobic bullying after a new student was harassed for wearing pink. People across the globe are now encouraged to wear pink on this day to take a stand against bullying and promote inclusivity.

Have you or your whānau ever experienced bullying? Share your thoughts on Pink Shirt Day below.

Type 'Not For Print' if you wish your comments to be excluded from the Conversations column of your local paper.

Image
Have you ever been bullied?
  • 80% Yes
    80% Complete
  • 19.6% No
    19.6% Complete
  • 0.4% Other - I'll share below
    0.4% Complete
1546 votes
15 hours ago

Little Shoal Bay boat yard licence ended

John Gillon from John Gillon - Kaipatiki Local Board

The Kaipātiki Local Board has formally ended the licence for the boat yard at Wai Manawa / Little Shoal Bay Reserve. The group's final day will be 20 June. The Local Board plan to consult with the public on the future use of this space.
Note: This decision does not affect boats moored in the bay.

Local Park Management Plan (LPMP):
The LSB Boatyard Inc's licence (which had been rolling over monthly since it expired in 2012) had become contrary to the reserve's management intentions when the LPMP was adopted in February.
The LPMP states the following intentions for Little Shoal Bay Reserve: "Discontinue boat maintenance and haulage yard activities on the reserve" and "Repurpose the boat maintenance and haulage yard area to support a greater range of recreation activities".
These intentions stop boatyard activities and were adopted following a robust democratic process with public consultation on all aspects of the reserve.
The LPMP hearing panel heard from LSB Boatyard Inc as well as supporters and opponents of the boat yard. After careful deliberation, the hearing panel concluded that the the activities should cease and recommended that to the Local Board. The Local Board endorsed this when it adopted the LPMP.

Boat Yard Remediation:
As part of the Shoreline Adaptation Plan process to plan for flooding in the reserve, the Local Board requested contamination testing of Little Shoal Bay Reserve following concerns that there was polluted material in the bay. The tests largely came back fine, except for the boat yard area which was found to be contaminated with heavy metals above the Unitary Plan discharge limits; and copper, lead, zinc, TBT and PCB concentrations above the Australian and New Zealand Guidelines for Fresh and Marine Water Quality sediment guidelines. The contaminants are not considered a danger to humans, but could be detrimental to the harbour.
Remediation of the boat yard area should be completed next week, with around 1,000m3 of contaminated material removed to stop it leaching into the harbour (30cm depth over 3,000m2). The area is being reinstated as gravel, but this can be changed in the future depending on the outcome of consultation. The damaged boat ramp has also been repaired as part of the project.

Image