Update on Beach Haven Wharf rebuild (wooden wharf)

John Gillon from

The recreational wharf has had restrictions on it for a few years now due to the piles and stairs deteriorating. And because of the heritage designation and engineering considerations, it has taken a very long time to achieve all of the required consents needed to rebuild the wharf. But the end is now in sight!
The project has been approved to go out for tender, which should happen in mid-January. A contract for construction should then be approved in late-February. But it could then take up to 3 months for the parts to be fabricated for the new pontoon portion, as there are only two NZ manufacturers and there are world-wide supply chain delays for steel.
So realistically, construction should be underway sometime between April - June 2021.

Background:
The project to replace the Beach Haven Wharf will rebuild the damaged parts of the wharf and piles, strengthening and upgrading it to today's safety standards, while keeping the heritage style of the wharf and providing a new floating pontoon platform for fishing and diving. See the attached design approved by the Kaipātiki Local Board last year.

More messages from your neighbours
6 days ago

Neighbourhood Challenge: Who Can Crack This One? ⛓️‍💥❔

The Riddler from The Neighbourly Riddler

What has a head but no brain?

Do you think you know the answer? Simply 'Like' this post if you know the answer and the big reveal will be posted in the comments at 2pm on the day!

Want to stop seeing these in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.

Image
3 hours ago

Auckland Harbour Bridge summer works

NZ Transport Agency (NZTA)

NZ Transport Agency Waka Kotahi is carrying out essential maintenance on the Auckland Harbour Bridge this December and January. The southbound clip-on lanes will be closed (24/7) from 26 December to 5 January for road resurfacing. Night-time lane restrictions will be in place throughout the summer for recoating work on the bridge. Traffic will still be able to travel in both directions at all times. Find out more

Image
4 days ago

Poll: 🗑️ Would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?

The Team from Neighbourly.co.nz

Aucklanders, our weekly rubbish collections are staying after councillors voted to scrap a proposed trial of fortnightly pick-ups.

We want to hear from you: would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?

Keen for the details? Read up about the scrapped collection trial here.

Image
🗑️ Would you be keen to switch to a fortnightly rubbish collection, or do you prefer things as they are?
  • 82.7% Same!
    82.7% Complete
  • 17.3% Would have liked to try something different
    17.3% Complete
335 votes