1145 days ago

AC Baths’ leisure pool and slides to close temporarily for maintenance

Darren Petry from Taupō District Council

The AC Baths’ leisure pool and hydroslides will close for 10 days this month for essential maintenance to be carried out.

The pool is scheduled to close at 2pm on Sunday, March 21 and reopen on Tuesday, March 30 at 6am when the complex opens.

About a million litres of water will have to be pumped out of the leisure pool to allow the first major maintenance and closure at the AC Baths since its refurbishment in 2013.

Business operations manager Scott Attenborough said the work would encompass replacing all the tiles around the bombing island and on the entry stairs, replacing disintegrating lining in the “water overflow” areas of the pool, the repair of pipes and valves and the cleaning and inspection of areas inaccessible when the pool is full.

He said two lanes of the outdoor 25m pool would be opened for public and leisure use from 10.30am to 3.30pm and from 6pm to closing each day during the closure to allow a space for leisure pool activity while avoiding peak outdoor 25m lane pool times.

“It’s unfortunate we need to shut the leisure pool for ten days to complete this work – but the silver lining is a refreshed, functional leisure pool at the end of it where everything is in working order,” he said. “The most visible result will be at the bombing island, where tiles are in a state of disrepair.”

The maintenance was originally scheduled for mid to late 2020, but emergency work on the indoor 25m pool took precedence last year so the leisure pool maintenance was moved to March of this year. The closure timing was to avoid school holidays and have the work completed when the weather was likely to be fairly dry.

The learn-to-swim pool, indoor and outdoor 25m pools and saunas would remain open. All aqua shallow classes normally held in the leisure pool from Monday March 22 to Monday March 29 had been cancelled and would resume Wednesday, March 31 as per the timetable. There would be no change to the aqua deep classes, which would be held as normal in the indoor 25m pool.

The maintenance has been planned and budgeted for in the Long-term Plan 2018-2028.

Image
More messages from your neighbours
13 hours ago

You can help grow the Waikato Community Rugby Fund

The Team from Momentum Waikato

Waikato Rugby celebrated 100 years of service to the community in 2021, but due to the pandemic the long-planned celebrations were not held until late 2022.

A highlight was a black-tie event at GloBox Arena at Claudelands where over 300 people enjoyed a wonderful night of reminiscence, remembrance, reconnection and reflection on what our national game means to the Waikato.

Many people put a lot of work into making the evening a massive success by all sorts of measures. One was fundraising $21,000 for the good of the game through auctions and donations, which has recently been transferred to the Waikato Community Rugby Fund at Momentum Waikato.

The Fund grows in perpetuity, with distributed returns only used for the benefit of the amateur community rugby, forever.

Donations to the Waikato Community Rugby Fund are always most welcome, to find out more and donate click the button below.

Image
15 hours ago

Were you at the V8s parade?

Libby Totton Reporter from Taupō Times

The excitement was palpable on the streets of Taupō as thousands turned out to welcome the V8 Supercars roadshow to town.

In a first for Supercars, and for Taupō, all 24 Supercars drivers and their cars drove 8.5km from Taupō International Motorsport Park to Te Ātea on Taupō’s lakefront for a meet and greet with fans on the eve of the inaugural ITM Taupō Super400.

Image
16 hours ago

Potted colour

The Team from Resene ColorShop Taupo

Express yourself with this artistic dip-dye paint effect using Resene paints. Find out how to create your own with these easy step by step instructions.

Image