1786 days ago

More problems with old Wellington pipes

Reporter Community News

A major waste water pipe has burst in central Wellington, closing roads and disrupting morning traffic. The pipe burst at the intersection of Victoria Street and Mercer Street yesterday afternoon. People in the central city are being asked to only flush the toilet if it is "essential".
The central Wellington sewerage pipe that broke, closing central city streets, was more than 100 years old.
Sewage flowed out onto the road after a pipe ruptured at the intersection of Victoria and Mercer streets on Monday afternoon.
Wellington Water confirmed the failed pipe was installed around the year 1910.
Repairing it is expected to take two to three days.

Image
More messages from your neighbours
2 hours ago

Neighbourhood Challenge: Who Can Crack This One? ⛓️‍💥❔

The Riddler from The Neighbourly Riddler

What has a head but no brain?

Do you think you know the answer? Simply 'Like' this post if you know the answer and the big reveal will be posted in the comments at 2pm on the day!

Want to stop seeing these in your newsfeed?
Head here and hover on the Following button on the top right of the page (and it will show Unfollow) and then click it. If it is giving you the option to Follow, then you've successfully unfollowed the Riddles page.

Image
23 days ago

Some Choice News!

Kia pai from Sharing the Good Stuff

Many New Zealand gardens aren’t seeing as many monarch butterflies fluttering around their swan plants and flower beds these days — the hungry Asian paper wasp has been taking its toll.

Thanks to people like Alan Baldick, who’s made it his mission to protect the monarch, his neighbours still get to enjoy these beautiful butterflies in their own backyards.

Thinking about planting something to invite more butterflies, bees, and birds into your garden?

Thanks for your mahi, Alan! We hope this brings a smile!

Image
2 days ago

Be prepared for upcoming roadworks

NZ Transport Agency (NZTA)

SH1 Transmission Gully works until mid-February, weather permitting.

There’s no roadworks for the holiday break from Friday 19 December, and all lanes will be fully open. Contractors are back to work on Monday 5 January, at night. Plan ahead for lane closures, night-time road closures and speed restrictions until mid-February. When the highway is closed, detours are via State Highway 59 and State Highway 58.
Chip-seal works begin in early January, so drivers must do 30km/h to prevent flying chip that can damage vehicles.
Learn more

Image