Northern Pathway: Westhaven to Akoranga
Have your say: 30 March to 12 April
Waka Kotahi NZ Transport Agency want your feedback on several aspects of the dedicated walking and cycling link between central Auckland and the North Shore.
In response to Covid-19, it’s no longer appropriate to have face to face events. Instead, we encourage you to go online for more information and to provide us with your feedback. We are continuing to progress this project as infrastructure will play a critical role in the economic recovery of New Zealand.
Visit: www.nzta.govt.nz/Northern-Pathway to read more about the updated design and complete the online survey.
Some Choice News!
Many New Zealand gardens aren’t seeing as many monarch butterflies fluttering around their swan plants and flower beds these days — the hungry Asian paper wasp has been taking its toll.
Thanks to people like Alan Baldick, who’s made it his mission to protect the monarch, his neighbours still get to enjoy these beautiful butterflies in their own backyards.
Thinking about planting something to invite more butterflies, bees, and birds into your garden?
Thanks for your mahi, Alan! We hope this brings a smile!
Auckland Harbour Bridge summer works
NZ Transport Agency Waka Kotahi is carrying out essential maintenance on the Auckland Harbour Bridge this December and January. The southbound clip-on lanes will be closed (24/7) from 26 December to 5 January for road resurfacing. Night-time lane restrictions will be in place throughout the summer for recoating work on the bridge. Traffic will still be able to travel in both directions at all times.
Loading…