A
1407 days ago

Petrol Tax per litre

Alan from Birkdale

Based on a price of $2.76 / litre in Auckland
The Prime Minister can blame rising living costs on ‘global conditions’ all she likes, but the cost of fuel is one thing she can control.
Taxes on a litre of petrol include:

70.024 cents in excise

6 cents in ACC levy

0.66 cents in Local Authorities Tax

0.6 cents in Engine Fuels Monitoring Levy

18.2 cents in ETS levy

0.076 cents in other levies

And in Auckland:

10 cents in Regional Fuel Tax

And charged on top of all taxes, plus the before-tax price:

15% in GST

This means the total tax on a $2.77 litre of petrol is $1.43 in Auckland and $1.31 in the rest of the country – about 52% and 48% of the average price, respectively.
www.taxpayers.org.nz...
Sign the petition www.fueltax.nz...

More messages from your neighbours
1 day ago

Poll: Is it ok to regift something that you have been given?

The Team from Neighbourly.co.nz

🎁 Holiday Gift Chat!

Do you ever regift?
What’s your take on asking for a receipt if a gift doesn’t fit?

Image
Is it ok to regift something that you have been given?
  • 79.2% Yes! It's better to regift what I don't need
    79.2% Complete
  • 20.8% No. It's the thought and effort that matters
    20.8% Complete
554 votes
30 days ago

Some Choice News!

Kia pai from Sharing the Good Stuff

Many New Zealand gardens aren’t seeing as many monarch butterflies fluttering around their swan plants and flower beds these days — the hungry Asian paper wasp has been taking its toll.

Thanks to people like Alan Baldick, who’s made it his mission to protect the monarch, his neighbours still get to enjoy these beautiful butterflies in their own backyards.

Thinking about planting something to invite more butterflies, bees, and birds into your garden?

Thanks for your mahi, Alan! We hope this brings a smile!

Image
1 day ago

Auckland Harbour Bridge summer works

NZ Transport Agency (NZTA)

NZ Transport Agency Waka Kotahi is carrying out essential maintenance on the Auckland Harbour Bridge this December and January. The southbound clip-on lanes will be closed (24/7) from 26 December to 5 January for road resurfacing. Night-time lane restrictions will be in place throughout the summer for recoating work on the bridge. Traffic will still be able to travel in both directions at all times. Find out more

Image