1439 days ago

Kitchen Makeover or New Kitchen? We can help

Kev from

Hi Neighbours,

In order to get a kitchen makeover your kitchen needs to be 20 years old or less. Anything older and you will need a new kitchen manufactured and installed.

We can replace all the doors, finished panels and hardware. The drawer systems will need to be completely replaced and we will update the handles and the benchtops. Prices all vary depending on the quality of materials you choose during the process.

A new kitchen will be designed, manufactured and installed. As we are all aware there are supply issues throughout the country. The lead time at the moment is at least 12 weeks after the deposit has been paid.

We will come to you with samples, do the measurements and supply the design and quote.

Contact us on 022 478 1586 or via the website in the link. The website will provide additional info also.

regards

The Team

More messages from your neighbours
1 day ago

Poll: Is it ok to regift something that you have been given?

The Team from Neighbourly.co.nz

🎁 Holiday Gift Chat!

Do you ever regift?
What’s your take on asking for a receipt if a gift doesn’t fit?

Image
Is it ok to regift something that you have been given?
  • 79.2% Yes! It's better to regift what I don't need
    79.2% Complete
  • 20.8% No. It's the thought and effort that matters
    20.8% Complete
554 votes
29 days ago

Some Choice News!

Kia pai from Sharing the Good Stuff

Many New Zealand gardens aren’t seeing as many monarch butterflies fluttering around their swan plants and flower beds these days — the hungry Asian paper wasp has been taking its toll.

Thanks to people like Alan Baldick, who’s made it his mission to protect the monarch, his neighbours still get to enjoy these beautiful butterflies in their own backyards.

Thinking about planting something to invite more butterflies, bees, and birds into your garden?

Thanks for your mahi, Alan! We hope this brings a smile!

Image
1 day ago

Auckland Harbour Bridge summer works

NZ Transport Agency (NZTA)

NZ Transport Agency Waka Kotahi is carrying out essential maintenance on the Auckland Harbour Bridge this December and January. The southbound clip-on lanes will be closed (24/7) from 26 December to 5 January for road resurfacing. Night-time lane restrictions will be in place throughout the summer for recoating work on the bridge. Traffic will still be able to travel in both directions at all times. Find out more

Image