AC Baths’ leisure pool and slides to close temporarily for maintenance
The AC Baths’ leisure pool and hydroslides will close for 10 days this month for essential maintenance to be carried out.
The pool is scheduled to close at 2pm on Sunday, March 21 and reopen on Tuesday, March 30 at 6am when the complex opens.
About a million litres of water will have to be pumped out of the leisure pool to allow the first major maintenance and closure at the AC Baths since its refurbishment in 2013.
Business operations manager Scott Attenborough said the work would encompass replacing all the tiles around the bombing island and on the entry stairs, replacing disintegrating lining in the “water overflow” areas of the pool, the repair of pipes and valves and the cleaning and inspection of areas inaccessible when the pool is full.
He said two lanes of the outdoor 25m pool would be opened for public and leisure use from 10.30am to 3.30pm and from 6pm to closing each day during the closure to allow a space for leisure pool activity while avoiding peak outdoor 25m lane pool times.
“It’s unfortunate we need to shut the leisure pool for ten days to complete this work – but the silver lining is a refreshed, functional leisure pool at the end of it where everything is in working order,” he said. “The most visible result will be at the bombing island, where tiles are in a state of disrepair.”
The maintenance was originally scheduled for mid to late 2020, but emergency work on the indoor 25m pool took precedence last year so the leisure pool maintenance was moved to March of this year. The closure timing was to avoid school holidays and have the work completed when the weather was likely to be fairly dry.
The learn-to-swim pool, indoor and outdoor 25m pools and saunas would remain open. All aqua shallow classes normally held in the leisure pool from Monday March 22 to Monday March 29 had been cancelled and would resume Wednesday, March 31 as per the timetable. There would be no change to the aqua deep classes, which would be held as normal in the indoor 25m pool.
The maintenance has been planned and budgeted for in the Long-term Plan 2018-2028.
Poll: Does the building consent process need to change?
We definitely need homes that are fit to live in but there are often frustrations when it comes to getting consent to modify your own home.
Do you think changes need made to the current process for building consent? Share your thoughts below.
Type 'Not For Print' if you wish your comments to be excluded from the Conversations column of your local paper.
-
91.3% Yes
-
8.2% No
-
0.4% Other - I'll share below!
Lest we forget...
On this ANZAC Day, let's take a moment to remember and honor the brave men and women who have served and continue to serve our country.
Tell us who are you honouring today. Whether it's a story from the battlefield or a memory of a family member who fought in the war, we'd love you to share your stories below.
Food and product recalls
These items have been recalled during the last month. If you have any of these items at home, click on the title to see the details:
Product recalls
Avanti, Malvern Star & Raleigh bicycles
Yoto Kids Speaker
Anko Kids Pyjamas
Battery drill chainsaw attachment
Industrial pedestal misting fan
Yamaha adaptor
Zero Tower safety harness
Naturacoco moisturising cream
Thule child bike seat
Food recalls:
Maketū pies mussel pie
The Catering Studio cottage pie
Matakana Smokehouse gravlax/salmon
Our Fruit Box fruit juices
ProLife Foods value packs - nuts, raisins.
YY Dumplings & Fu Yuan ready-to-eat meat products
Waiheke Herbs italian herb spread
We hope this message was helpful in keeping your household safe.